The flat was damp and had a number of issues to resolve involving drainage, M&E’s and a single glazed lean to roof. Redesigned rear roof, two new bathrooms and shower room, fitted AV multi-room system, joinery, conversion of coal cellar into occasional room and all fixtures and finishes.